Major Public Projects
Download the full Capital Improvement Program (CIP) by visiting the Capital Projects Management webpage.
Showing 34 projects
-
Rice Avenue & Fifth Street/SR-34 Grade Separation
Will include a bridge, connector road, two traffic signals, traffic signal improvements at Sturgis Road, Class II on-street bicycle lanes, sidewalks, and accessibility improvements.
-
Campus Park Activation
This nature-based project is built on robust community participation, stemming from the City of Oxnard’s Parks and Recreation Master Plan.
-
Durley Park Improvements
The City of Oxnard won a $7.1 million grant for improvements to Durley Park as part of Governor Newsom’s “Outdoors for All” initiative.
-
Citywide Neighborhood Street Resurfacing Project – Phase I
The Citywide Neighborhood Street Resurfacing Project, Phase I is part of Oxnard’s Capital Improvement Program (CIP) to improve residential roads.
-
Sports Park
Sports Park is approximately twenty (20) acres of undeveloped park space located at the corner of Oxnard Boulevard and Gonzales Road. Council has approved the designation of this park to be a baseball/softball complex.
-
Oxnard Eastern Trunk Sewer Manhole Evaluation and Rehabilitation – Phase I
The rehabilitation of 150 existing manholes, and the replacement of 152 existing cast iron manhole frames and covers.
-
Wastewater OWTP: Reliability Improvements
Protecting public health, ensuring we can preserve aquatic ecosystems, meet regulatory standards, and support economic growth and community needs.
-
Aquifer Storage and Recovery (ASR) Completion
Improving local water supply needs by allowing water storage during wet periods for use during dry seasons.
-
La Colonia Neighborhood Street Resurfacing – Phase III
Enhancing transportation infrastructure in the La Colonia neighborhood by resurfacing several streets and constructing new sidewalks and curb ramps.
-
Carty Park Playground Replacement
New playground equipment and engineered wood fiber surface will help enhance the amenities at Carty Park.
-
Environmental Resources Del Norte Video Surveillance
Install new cameras and a new digital video security system.
-
Ormond Beach Access
Provide bike and pedestrian improvements along Edison Drive, between Hueneme Road and the SCE power plant at Ormond Beach.
-
Fremont Tot Park Playground Replacement
Existing playground equipment at Fremont Tot Park has reached the end of its useful life and is in need of replacement.
-
College Estates Playground Replacement
Remove and dispose of existing playground equipment and replace it with a new playground system and engineered wood fiber safety surfacing.
-
Ramona Preschool Pedestrian Crossing Enhancements
Install pedestrian facilities at intersections adjacent to Ramona Preschool to enhance crosswalks and increase school-age pedestrian safety.