Major Public Projects

Download the full Capital Improvement Program (CIP) by visiting the Capital Projects Management webpage.


Showing 34 projects

  • CIP Classification: Transportation & Drainage

    Rice Avenue & Fifth Street/SR-34 Grade Separation

    Will include a bridge, connector road, two traffic signals, traffic signal improvements at Sturgis Road, Class II on-street bicycle lanes, sidewalks, and accessibility improvements.

  • CIP Classification: Parks & Open Spaces

    Campus Park Activation

    This nature-based project is built on robust community participation, stemming from the City of Oxnard’s Parks and Recreation Master Plan.

  • CIP Classification: Parks & Open Spaces

    Durley Park Improvements

    The City of Oxnard won a $7.1 million grant for improvements to Durley Park as part of Governor Newsom’s “Outdoors for All” initiative.

  • CIP Classification: Transportation & Drainage

    Citywide Neighborhood Street Resurfacing Project – Phase I

    The Citywide Neighborhood Street Resurfacing Project, Phase I is part of Oxnard’s Capital Improvement Program (CIP) to improve residential roads.

  • CIP Classification: Parks & Open Spaces

    Sports Park

    Sports Park is approximately twenty (20) acres of undeveloped park space located at the corner of Oxnard Boulevard and Gonzales Road. Council has approved the designation of this park to be a baseball/softball complex.

  • CIP Classification: Utilities

    Oxnard Eastern Trunk Sewer Manhole Evaluation and Rehabilitation – Phase I

    The rehabilitation of 150 existing manholes, and the replacement of 152 existing cast iron manhole frames and covers.

  • CIP Classification: Utilities

    Wastewater OWTP: Reliability Improvements

    Protecting public health, ensuring we can preserve aquatic ecosystems, meet regulatory standards, and support economic growth and community needs.

  • CIP Classification: Utilities

    Aquifer Storage and Recovery (ASR) Completion

    Improving local water supply needs by allowing water storage during wet periods for use during dry seasons. 

  • CIP Classification: Transportation & Drainage

    La Colonia Neighborhood Street Resurfacing – Phase III

    Enhancing transportation infrastructure in the La Colonia neighborhood by resurfacing several streets and constructing new sidewalks and curb ramps.

  • CIP Classification: Parks & Open Spaces

    Carty Park Playground Replacement

    New playground equipment and engineered wood fiber surface will help enhance the amenities at Carty Park.

  • CIP Classification: Utilities

    Environmental Resources Del Norte Video Surveillance

    Install new cameras and a new digital video security system.

  • CIP Classification: Parks & Open Spaces

    Ormond Beach Access

    Provide bike and pedestrian improvements along Edison Drive, between Hueneme Road and the SCE power plant at Ormond Beach.

  • CIP Classification: Parks & Open Spaces

    Fremont Tot Park Playground Replacement

    Existing playground equipment at Fremont Tot Park has reached the end of its useful life and is in need of replacement.

  • CIP Classification: Parks & Open Spaces

    College Estates Playground Replacement

    Remove and dispose of existing playground equipment and replace it with a new playground system and engineered wood fiber safety surfacing.

  • CIP Classification: Transportation & Drainage

    Ramona Preschool Pedestrian Crossing Enhancements

    Install pedestrian facilities at intersections adjacent to Ramona Preschool to enhance crosswalks and increase school-age pedestrian safety.