Major Public Projects
Download the full Capital Improvement Program (CIP) by visiting the Capital Projects Management webpage.
Showing 12 projects for 1 – Health & Safety
-
Rice Avenue & Fifth Street/SR-34 Grade Separation
Will include a bridge, connector road, two traffic signals, traffic signal improvements at Sturgis Road, Class II on-street bicycle lanes, sidewalks, and accessibility improvements.
-
Wastewater OWTP: Reliability Improvements
Protecting public health, ensuring we can preserve aquatic ecosystems, meet regulatory standards, and support economic growth and community needs.
-
Aquifer Storage and Recovery (ASR) Completion
Improving local water supply needs by allowing water storage during wet periods for use during dry seasons.
-
Carty Park Playground Replacement
New playground equipment and engineered wood fiber surface will help enhance the amenities at Carty Park.
-
Fremont Tot Park Playground Replacement
Existing playground equipment at Fremont Tot Park has reached the end of its useful life and is in need of replacement.
-
College Estates Playground Replacement
Remove and dispose of existing playground equipment and replace it with a new playground system and engineered wood fiber safety surfacing.
-
Ramona Preschool Pedestrian Crossing Enhancements
Install pedestrian facilities at intersections adjacent to Ramona Preschool to enhance crosswalks and increase school-age pedestrian safety.
-
Fire Station No. 2
This new construction will include a new two-story Oxnard Fire Station 2 building and ancillary site structures.
-
Fire Station No. 3
A new Oxnard Fire Station 3 will include a two-story living quarters and office area, and a single-story apparatus bay and service area.
-
Fire Station No. 4
Constructing of a new single-story Oxnard Fire Station 4 building and ancillary site structures.
-
South Oxnard Center Lighting
These upgrades will address existing lighting and safety concerns in the parking area serving the South Oxnard Library, and evening events taking place in Community Center.
-
Stormwater Conveyance Improvements Along Oxnard Blvd
Install an approximately 250 foot long concrete v-ditch along Oxnard Boulevard.