Major Public Projects
Browse the City’s major projects to learn about funding, project timelines, priority, and more. Download the full Capital Improvement Program (CIP) by visiting the Capital Projects Management webpage.
Showing 24 projects for 2 – Asset Preservation
-
Durley Park Improvements
The City of Oxnard won a $7.1 million grant for improvements to Durley Park as part of Governor Newsom’s “Outdoors for All” initiative.
-
Advanced Metering Infrastructure (AMI) Replacement
Oxnard’s new AMI meters offer real-time water use data & leak alerts. Stay informed with the EyeOnWater dashboard for smarter water management.
-
Carnegie Art Museum Seismic Study
Evaluate the seismic needs of Carnegie Art Museum to restore operations and ensure safety. Funding provided by Measure O.
-
Colonia Youth Boxing Gym – Roof Replacement
Revitalizing the Colonia Youth Boxing Gym with a new roof! Will replace worn decking, insulation, and more, to ensure safety and prepare for interior remodeling.
-
River Ridge Clubhouse Roofing Replacement and Exterior Improvements
Preserve the River Ridge Clubhouse by replacing the roof and structural beams; preventing costly future repairs. Built in 1986 this is the first major facelift.
-
La Colonia Boxing Gym
Observe the transformation of Oxnard’s historic boxing gym into a modern community hub, focusing on youth development and boxing excellence.
-
Mandalay Bay Bridge and Edison Canal Bridge Rehabilitation
Repairs included deck and underside refurbishment, hinge seal and diaphragm bolster replacement, rust removal, riprap replacement, and seismic restraining shell maintenance.
-
City Hall and Annex Improvements (2025-2029 CIP)
Assessing and enhancing the exterior facade of the City Hall and Annex buildings to address needed repairs and improve structural integrity.
-
Scale House and Truck Weigh Scale Replacement
Will enhance facility operations with new truck scales. Improve accuracy, performance, and vehicle circulation seamlessly.
-
Civic Center West Wing Building Improvements
Explore essential updates: roof replacement, elevator repair, asbestos removal, and HVAC improvements at Civic Center West Wing.
-
City Hall HVAC & EMS
Upgrade a 100-ton HVAC system & EMS to enhance efficiency and sustainability. Will prevent continued costly repairs with advanced energy management solutions.
-
Safe Routes to School Safety and Enhancements
Join Oxnard’s Safe Routes initiative! Enhancing school travel safety through shared maps & community workshops. Explore non-vehicle commuting today!
-
La Colonia Neighborhood Street Resurfacing – Phase III
Enhancing transportation infrastructure in the La Colonia neighborhood by resurfacing several streets and constructing new sidewalks and curb ramps.
-
Citywide Neighborhood Street Resurfacing Project – Phase I
The Citywide Neighborhood Street Resurfacing Project, Phase I is part of Oxnard’s Capital Improvement Program (CIP) to improve residential roads.
-
Oxnard Eastern Trunk Sewer Manhole Evaluation and Rehabilitation – Phase I
The rehabilitation of 150 existing manholes, and the replacement of 152 existing cast iron manhole frames and covers.